The sun is showing off. Your bill is not impressed.

Let us be honest: Malaysian sunshine is on another level. By 11am you are sweating through your shirt, by 2pm the steering wheel is basically a frying pan, and by night you are staring at the aircond bill wondering why nobody warned you about adulthood.

Here is the weird part. All that free sunshine is sitting right above us, yet most businesses cannot actually buy clean power made from it. Not easily, not at a size that suits them, and definitely not without a lawyer, a consultant and three rounds of approvals.

And it is not because solar is expensive. Utility-scale solar produced electricity at a global weighted average of US$0.044 per kWh in 2025 (18 sen/kWh), about 41% below the cheapest fossil fuel option, according to IRENA. The sun is cheap. The sun is plentiful. The sun is not the problem.

The problem is how we buy it, and the fix is a lot more fun than you would expect. It starts with a folk tale about soup, passes through a kenduri (feast) and an office tapau order, and ends with a question for you. Stay with us.

Solar is cheap, so why can most businesses not buy it?

You know the free-shipping trap. You want one small thing, the e-commerce app says add a few more items for free delivery, and suddenly you are buying phone cases you never needed just to hit the number.

Clean power has the same trap, only much bigger. National supply schemes for corporate buyers usually set a minimum size for a utility-scale solar farm, because a project too small to cover its own connection, contract and financing costs will not take off. While this makes sense for the solar developer, for the buyer it is a wall. Most businesses, and almost every single tenant in an industrial park, use far less electricity than that is produced by the solar farm.

Picture a classroom where every kid owns exactly one crayon. The sunrise on the wall needs the whole box. Nobody has a box, and nobody wants to be the one who walks around asking everyone else.

So demand exists and supply could be built. A solar farm developer can already serve several buyers, but nobody gathers the buyers first, so each tenant waits for a developer to find it and developers wait for buyers big enough to bother. It is the group project where everybody uploads a different file format and nobody merges them.

Who would design a market like that on purpose? Nobody did. Which also means we are allowed to redesign it.

The Stone Soup story, and your kampung’s version of it

There is an old folk tale, told in many countries with small variations, about a hungry traveller who walks into a village where nobody has food to spare. He announces that he will make soup from a stone, and asks only for a pot and some water. The villagers watch with doubt. Then one brings a carrot, another an onion, a third some potatoes, a fourth a handful of herbs.

By evening the whole village is sharing a feast that no single household could have cooked. Nobody gave much. Everybody ate well.

You already know this story, because you have probably experienced it. At a kenduri kampung (village feast), no family cooks for hundreds of guests alone. One brings the rice, one does the rendang, one makes the sambal, and the neighbours lend the pots, the tables and a whole weekend of their time. We call it gotong-royong, and it works because while every contribution is small, the result is greater than the sum of its parts.

The stone in the folk tale is just the starter, the thing that gets the first carrot moving. The real hero is the pot, the shared place where small contributions combine into something none of them could be alone.

The idea is simple: what if clean power had a pot?

Group buy, but for electricity

You have done this before, whether you realised it or not. Someone in the office posts in the group chat, “Tapau lunch, who wants?”, and everyone adds their name and their order. Nobody orders more than they can eat. Nobody needs to understand how the restaurant runs its kitchen. The shop gets one big order, the delivery fee gets split, and lunch arrives hot.

Now swap the nasi campur for green electricity. Businesses in an industrial park each say how much clean power they would like to buy. Nobody commits to more than they can use, and nobody has to become an expert in power markets. Once the combined order reaches the minimum size, it is big enough for a developer to build, a lender to finance and a buyer to rely on.

Someone has to be the one who keeps the list and chases the shop, of course. We need one accountable party to tend the pot: keep the registry, talk to developers and make sure everyone who signed up actually gets their share of the soup.

The good news is the pipes already exist. Under the Corporate Renewable Energy Supply Scheme (CRESS), one developer can supply several buyers over the national grid, and the Community Renewable Energy Aggregation Mechanism (CREAM) does something similar for rooftops. What neither does is gather the buyers first. That is the part a group order adds.

In practice, a group order moves through five steps:

  1. Put your name down. Each business says how much clean power it would like, and from when.
  2. Count the heads. All the entries are added up and the total is shared openly.
  3. Find the cook. The accountable party asks developers to bid to supply the whole order.
  4. Clear the road. Grid work and approvals begin together, so the supply has a route to its buyers.
  5. Share the food. Each member gets its portion, with one person to call and one bill.

No new technology. No moonshot. Just a group chat with better paperwork.

Why one big order beats twenty small ones

This is not a cute trick. Group buying works in every market for the same reasons, and three of them matter a lot for electricity.

Size. Developers, lenders and equipment suppliers all include the fixed cost of dealing with a customer in their prices. One large order spreads that cost over many units, whereas twenty small buyers each carry it in full. Pooling moves that fixed cost from every buyer to the group, and the saving can be shared. Same logic as splitting the delivery fee, just with more zeros.

Certainty. Before a bank finances a solar farm, it asks one question: will somebody buy the output for long enough to repay the loan? A registry of committed demand answers that in advance. Corporate buyer groups in several markets have pooled demand for exactly this reason.

Simplicity. Economists call a market where many buyers and sellers meet at the same time and place a thick market, and they find that thick markets clear more easily than thin ones. Think of a pasar malam (night market). The stalls gather in one place on one evening, and shoppers find what they want because everybody knows where to look. Thin markets are the opposite: good matches exist but nobody can find each other. A shared registry gives clean power its own pasar malam.

None of this needs a new invention. It needs a place to record demand, a rule for how it is pooled, and someone accountable to keep the list honest. All three are administrative, which is a polite way of saying we can start now.

Clean power should feel as close as the tap

Right now, clean power feels far away. It is a panel in a distant field, a contract as thick as a telephone directory, or a certificate bought in another country that you never see. Why should a factory manager need a specialist to buy what falls on the roof for free?

We want it to feel as close as the tap. A business moving into an industrial park should find green supply listed in the park’s offer, right next to water and gas, with one person to call, one place to register interest and a bill you can read without a consultant. The tenant says what it wants, and the group arranges the rest.

Then it gets closer still. Rooftop solar on homes, shops and schools already makes electricity that the owner cannot always use at the moment it is generated. Malaysia allows part of this today through CREAM, where a local aggregator leases rooftops and supplies consumers within a radius of 5 km, and a group order would add a shared registry on the buying side. With simple rules and simple billing, a householder becomes a supplier in the way a smallholder sells vegetables at the pasar malam. Money stays among neighbours, and the benefit of clean power becomes something you can see from your own street.

There is a practical reason to care about this closeness. People support what they can see and understand. A clean power system that ordinary people can join, read and benefit from is far more likely to keep its public support for decades, and that support is what makes investors willing to commit for that long.

And yes, if you rent or live in an apartment with no roof of your own, you are exactly the person who should be asking when this reaches you. Good question. Keep asking it.

Why investors, and your future employer, care

Every region that wants investment competes on the same checklist: land, water, skills, connectivity and a regulatory environment that does not change every other month. Electricity was always on that list. What has changed is the question investors now ask about it. It used to be “is there power?” Now it is also “is the power clean?”

Three things push that question to the top.

First, many multinational companies have set targets to buy renewable electricity for their operations, and a plant that cannot buy clean power makes those targets harder to hit.

Second, Europe is putting a price on carbon at its border. The EU’s Carbon Border Adjustment Mechanism (CBAM) covers cement, iron and steel, aluminium, fertilisers, electricity and hydrogen. It entered its definitive period on 1 January 2026 and charges importers for the emissions embedded in those goods, with certificate purchases due from 1 February 2027.

Third, customers further along many supply chains now ask their suppliers where their power comes from, whatever the regulation says.

A site that can offer clean electricity on simple terms answers all three at once. Would you build your next plant where green power is already waiting, or where you have to negotiate for it from scratch? Ready clean power works like a good road or port: shared infrastructure, built once and used by every company that arrives.

Be careful with the claim, though. Clean power does not make anyone invest by itself, because investment decisions depend on the whole package that the location offers. However, without clean power a company will have a reason to look elsewhere, and a location that removes that reason stays on the shortlist. And that matters because investment is where jobs tend to come from. How many, and where, depends on a lot of things, but a location that is off the shortlist has already lost its competitiveness.

Plot twist: the grid needs a head start

Timing needs the same care as a wedding kenduri. A host who lays the tables after the guests have arrived serves a late and awkward meal.

In many countries, solar farms can be built faster than the grid can be reinforced to carry their output. The head of the International Energy Agency has estimated that about 1,500 GW of renewable projects are waiting for grid connection, roughly five times the solar and wind capacity added worldwide in the previous year, and the agency reports that a single high-voltage overhead line can take five to 13 years to approve in advanced economies.

That is like finishing the stall and finding there is no road to the pasar malam. A scheme that signs buyers fast and builds generation fast, while the grid follows its own timetable, produces projects that wait for a connection infrastructure and buyers who wait for their power. The people who joined first are penalised, paying the biggest chunk for infrastructure cost.

So the order of the steps matters more than the speed of any one step. The grid work, the approvals and the demand registry should begin together, so the first panels arrive when the connection is ready for them. Starting small helps too. A first phase sized to the connection that already exists proves the concept without waiting for new lines, and later phases follow as the grid grows.

Sequencing is boring work, and it is where most good ideas win or lose.

What we have not figured out yet

A good idea comes with its homework, so here are the three biggest things that still needs work on.

Is it even allowed? A group that gathers demand and buys on behalf of others could be treated as a supplier under the licensing rules, and that decides what shape it can take. It needs proper legal review before anyone builds anything.

Who pays for the wires? The sunniest places are often not where the grid is strongest, and no group order can move sunshine closer to demand. Somebody has to decide who carries the connection cost.

Will the neighbours come along? People who live beside panels, lines and substations need to see a benefit and have a clear way to raise complaints, and that work carries on for the life of a project.

Who brings the first carrot?

The sun is already shining and the pot is already on the stove. What the pot needs now is the ingredients, and each of the kampung folk holds a different one. Each party would have a different view of what and when their ingredient is put in, and what would stop them.

For an industrial park operator, what would a tenant need to see in the offer before it registers interest, and how big the combined order must be before a first project is worth building.

For industries that buys electricity at scale, what would be the contract length, price certainty and reporting needed to join a group order, and which of those factors they could live without.

For solar projects builders or financiers, what would be the the smallest pooled order that would bring a project to financing, and the terms that would make them bid for it.

For rooftop owners or communities living beside a solar farm, what benefit, and what way to complain, what would make them open to take part.

For grid planners and operators, how much connection capacity could be offered to a first phase, and how early the first approvals would need to start.

For regular people who are young, renting and wondering where he/she fits in all of this, what would make them join a community clean power order, and what would make them scroll past. 

Every stakeholder’s answer will influence the size of the first order and may also determine the point where the idea breaks. 

Who will bring the first carrot?

Author:

Adam Hanif
Senior Associate

——- 

Let’s transform together. Contact us at: https://pemandu.org/contact-us/

Related Articles

Our commitment to collaboration fosters

Strategic alliances with
Cordence Worldwide

— empowering us to achieve more side by side.
Learn More
Perintis Akal is a proud partner of

Our network of
transformational leaders

— reforming industries and shaping the future together.
Learn More
Our passion for excellence has earned us

Recognition, Awards,
and Achievements

— but it's the impact we create that truly drives us.